Case Study: Asset Management

livin is committed to providing homes that are warm and affordable to live in. As a result of the works undertaken as part of the ECO Insulation Project to homes in Spennymoor and Tudhoe, tenants have seen a substantial improvement in the energy efficiency of their homes during 15/16, giving them a reduction in their fuel bills of approximately £400 per year. Historically the area has experienced high levels fuel poverty; therefore it was vital to ensure that all homes were well insulated prior to the onset of winter to protect the welfare of tenants.

It is estimated that the innovative project design and collaborative delivery will deliver savings of over 5,000 tonnes of CO2 over the lifetime of the insulation – the equivalent of an ‘average’ car travelling 12.5 million miles.

 